Generator & Input Requirements | EON800 + ALTA X

Required Generator & Input for Tethered ALTA X

Generator Requirements

The Tether Ground Station requires an input between 200-250V, 47-63Hz and maximum operating continuous current of 30A.

Tether Ground Station Input Lead

The Tether Ground Station to Generator Input Lead is required to connect the generator to the EON800 Tether Ground Station. The Power connector on front of Tether Ground Station is a powerCON NAC3MP-HC socket, which requires a mating NAC3FC-HC plug. The connectors comprise of contacts for phase, neutral and protective earth (ground) conductors rated for currents up to 32 A and for voltages up to 250V.

1x Generator to TGS AC Input Lead | 240v+30A | 3m/10ft is supplied with the system (NAC3FC-HC to NEMA L14-30P).

Last updated